This Week in Logistics: Tracking Tariffs, the Rent Reset, and Peak Season Cut-offs
This Week In Logistics, hosts CartonCloud CEO Shaun Hagen and Account Executive Javier Hernandez catch up on a month of news: what the US midterms do and don't change for tariffs, why warehouse rent is resetting on both sides of the Pacific, and why peak season cut-offs are already closing in.
Published:
November 10, 2026

TABLE OF CONTENTS
Every operator has this question on their mind this week: will the midterm election results change what we pay in tariffs? The short answer: not yet (and maybe not for a while). While border tariffs remain in place, warehouse rent is resetting higher on both sides of the Pacific, and peak season cut-offs are closing in fast.
Here is what you need to know about pricing, leasing, and peak readiness this month.
TL;DR — The short version
- The US midterm election results: While Congress is projected to flip from 3 January, the tariffs you pay at the border still haven't moved — so plan around current tariffs carrying through your next cycle.
- Diesel didn't follow crude down: Brent crude had its biggest weekly drop since 2020, but US diesel costs haven't moved with it. Worth checking whether yours is indexed to diesel or a flat annual rate, since a flat rate is what leaves you absorbing the spikes.
- Warehouse rent is resetting on both sides of the Pacific: Vacancy is beginning to tighten on both sides of the Pacific, with landlords renewing leases higher as a result. Map every 2027 lease now and start the landlord conversation at least 18 months out, so you can negotiate rent on your terms.
- Robotics-as-a-service (RaaS) opens up the mid-market: While Walmart makes enterprise automation commitments, RaaS turns robotics into a manageable monthly OPEX expense, making introducing robotics into your operations a viable option for many mid-market 3PLs.
- Peak season cut-offs are underway: Carrier cut-offs are landing earlier than usual this peak, and volumes are already projected to run high. Set your own cut-off a few days ahead of the carriers and lock in temp staff before Black Friday so you can avoid any rush freight costs and missed delivery promises in the final week.
I'm Shaun Hagen, CEO of CartonCloud, and I host our podcast This Week In Logistics (TWIL) alongside co-host Javier Hernandez. We ran a few special episodes through October, so this one catches up on a whole month of news, and the US midterms landed right in the middle of it.
It's a timely reminder of something we've said before on TWIL: price and plan for the environment you're actually in today, not the one the headlines suggest might come tomorrow.
Here is a straightforward look at what moved this month, why it matters to your floor, and what we can do about it this week.
Operator playbook: what to do in the next seven days
- Confirm who pays the tariffs on every active contract. Assume today's tariffs carry into your next planning cycle, and make sure your contracts actually say who absorbs them if they don't change.
- Map every lease and customer contract that renews in 2027, and start the landlord conversation now. That means starting the conversation eighteen months before the renewal date, not the usual six. Plus, check your storage escalators are actually tracking your cost of space before you're negotiating under pressure.
- Set your own peak cut-off two to three days ahead of your carrier's, and lock in temporary staff this week. Validate your labels now so a bad scan doesn't cost you the slot you set.
What happened this month
What the US midterm election results mean for tariffs + fuel bill
Trade policy has been a moving target all season, and the tariff story has stayed near the top of our watch list the whole way through. Now that the midterm results are in, here's where that lands for tariffs and fuel.
- US Congress Projected to Flip in January: Democrats are expected to control both the House and Senate when the new Congress sits on 3 January, after a campaign where cost of living, and tariffs specifically, were front of mind for most voters.
The tariff advice still holds from what we've discussed all season:
- Assume current tariffs carry into your next planning cycle, and confirm your contracts actually say who pays for them.
- Don't lock in a multi-year sourcing decision on the assumption that tariffs come off quickly. Plan for them to stay, and treat any relief as upside.
On the fuel side, Brent (the global oil-price benchmark) had its biggest weekly drop since 2020, down more than 13% to just under $100 a barrel, but US diesel is still around $6.29 a gallon, roughly $2.50 higher than a year ago.
Here's why that gap matters for operators: if your fuel surcharge is pegged to the Brent benchmark rather than the diesel price you're actually paying at the pump, it's already out of date. Javier breaks down exactly what to check on your own surcharge:
"The other question I'd ask is how your fuel surcharges actually work. Is it indexed to diesel? Who updates it, and how often? Or is it a flat rate someone reviews once a year, in which case you either eat the spikes or sit on the falls, and customers notice both. A surcharge that moves both ways is a lot easier to defend." — Javier Hernandez, Account Executive, CartonCloud.
Operator Takeaway: Confirm who pays the tariffs on every active contract, and check whether your fuel surcharge actually moves both ways. A flat annual rate just means you're absorbing the spikes without passing them on.
The rent reset: warehouse space is tightening on both sides of the Pacific
If your lease renews in 2027, this is the headline to plan around. The spare capacity that's kept rent increases modest the last couple of years is beginning to tighten out on both sides of the Pacific, and landlords are already pricing that in.
- US vacancy is down to 6.4%, according to CBRE's Q3 2026 industrial and logistics market report — the strongest quarter of demand since late 2022.
- Prologis, one of the largest industrial landlords in the US, reported its warehouse portfolio at 95.6%, with new leases resetting about 38% higher than the old ones.
- Australia isn't far behind, as JLL reports the biggest quarter of warehouse leasing on record, with vacancy down to 4.6%, though rents there have stayed flat for the quarter so far.
Here's why this matters for operators: in the US, the spare space that kept rent increases modest the last couple of years is mostly gone, so the earlier conversation gives you more say in where the number lands. In Australia, rents haven't caught up yet, but with vacancy at a record low, that's a matter of when, not if, so this is the window to lock in terms before the same reset hits.
"If your warehouse lease renews in 2027, start the conversation now, because the spare space that kept rent rises modest for the last couple of years is mostly gone." — Javier Hernandez, Account Executive, CartonCloud.
Whichever side of the Pacific you're on, three things are worth checking before you walk into your next lease conversation:
- Map every lease and customer contract that renews in 2027, and start the conversation 18 months out, not six.
- Check that your storage rates and escalators actually track your cost of space.
- Know where that storage rate actually lives. Is it in a spreadsheet someone updates by hand, or is a rent increase going to turn into a repricing project right before your busiest season?
As discussed in our CartonCloud Logistics Index deep dive episode, the CCLI found that operators across NA and ANZ are running at about 77% of capacity on average, and the smaller operators with the most room to spare were the least confident about the next six months. Now, that's worth keeping in mind here, because space you can't fill isn't an opportunity, it's a cost (and that's exactly the number to know before you sit down with your landlord).
If you want to see how your own storage rates stack up against similar operations before that conversation, check out our interactive benchmarking tool, which lets you filter by region, business size, and operation type.
Operator Takeaway: If your lease renews in 2027, start that conversation now, not when the new rent lands.
What's shifting in warehouse automation
Warehouse automation is no longer a future bet for the largest operators, it's showing up on the floor right now.
GXO is taking Agility Robotics' Digit humanoid robots to two more US sites under its multiyear robotics-as-a-service agreement with Agility, and Walmart has committed about $6 billion over several years to put Symbotic automation into twenty-five of its regional distribution centres. GXO's deal is the clearer example of the part that actually matters for a smaller operation: not the scale Walmart is buying outright, but the rental model GXO is renewing into.
"What's really interesting is that the rental model is what starts to bring automation within reach of smaller operators, that's what's being called robotics as a service, or hiring automation." — Shaun Hagen, CEO, CartonCloud.
Operator Takeaway: Ask what robotics-as-a-service would actually cost your operation before writing off automation as something only the bigger players can do.
Peak season is here
Mark your calendars: the carrier cut-off dates are in, and getting ahead of them now is what keeps your customer promises intact.
- Australia Post: expects more than 120 million parcels across November and December (up from around 111 million last year, which was already a record). If your own peak is tracking anywhere near that growth, this is the number to plan your cut-off around.
- UPS: hiring more than 100,000 seasonal workers, fewer than last year, because it's carrying less of Amazon's volume and running a much more automated network. Nearly 70% of its packages now move through an automated process, which makes clean labels and standardised cartons even more important for getting through that network without a hold-up.
- USPS + FedEx: USPS recommends shipping Ground Advantage by 17 December, and FedEx Ground Economy's last day is 15 December — the two dates worth working backward from if you want a buffer before your own cut-off.
If your volume is set to run higher than what your carrier planned for, sharing accurate peak projections with that carrier early helps align their capacity with your actual outbound flow.
"That's the bit that matters for a 3PL, if UPS expects volumes to jump about 25% from Q3 to Q4, and it's planning that off its customers' forecasts, if your peak is going to run well above that, you need to tell your carrier now, not as soon as Black Friday drops or the Christmas peak starts." — Shaun Hagen, CEO, CartonCloud.
Here are three things to do now so peak goes smoothly:
- Cut-off dates: work back from your carrier's date and set your own a few days earlier.
- Labels + cartons: a bad label can send a parcel round the sorter again and again, and a parcel stuck in the sorter can miss the cut-off regardless of when you shipped it. Test-scan a sample now and standardise your carton sizes so label validation is a simple safety net rather than a scramble.
- People: lock in your temporary staff before the rush so they're trained before the spike, not during it.
Operator Takeaway: Set your own cut-off two to three days ahead of your carrier's, validate your labels this week, and get an honest peak forecast in front of your carrier before Black Friday.
What to watch this week
- Trade. Watch whether the new Congress and the ongoing talks with Canada and Mexico actually change any of the tariffs paid.
- Fuel. OPEC meets again on 29 November, and whether this week's fall in crude actually reaches the pump sets the tone for diesel into the new year.
- Robotics. Watch whether more robot makers start offering robotics as a service, once automation is a monthly bill instead of a capital purchase, it becomes a real option for smaller 3PLs too.
FAQ
Q: Do the US midterm results change the tariffs 3PLs are paying?
A: No. Control of Congress is projected to change hands from 3 January, but most tariffs in place now rest on trade laws the president can act on without a new vote, and overriding a veto needs two-thirds of both chambers. The honest planning assumption is that meaningful change is a 2027 question at the earliest.
Q: Why is US warehouse vacancy falling?
A: US industrial vacancy is down to 6.4%, the strongest quarter of demand since late 2022, with Prologis reporting that spare capacity in its customers' networks has largely cleared. New leases are resetting about 38% higher as a result.
Q: Is Australian warehouse rent rising as fast as the US?
A: Not yet. JLL reports Australia's vacancy down to 4.6% after its biggest quarter of warehouse leasing on record, but rents have stayed basically flat for the quarter. Record demand against half the usual new supply is how a rent reset typically starts.
Q: When are peak season carrier cut-offs this year?
A: Australia Post's standard cut-off is 21 December, as early as 14 December for parts of Western Australia and the Northern Territory. In the US, USPS Ground Advantage's cut-off is 17 December and FedEx Ground Economy's last day is 15 December.
Q: What is robots-as-a-service?
A: Robots-as-a-service is a rental model for warehouse automation, where operators pay a monthly bill instead of a capital purchase. It's what's bringing automation within reach of operators who couldn't previously justify buying robotics outright.
Post by Shaun Hagen, CEO CartonCloud.
Shaun Hagen: The vote is in. The tariffs are still here. Oil just had its biggest weekly drop since 2020, and peak has already started. It's a big month, and all of it lands in your next round of contracts. Hey everyone, I'm Shaun Hagen, CEO of CartonCloud, and this is This Week in Logistics. Javier, welcome back to the desk. We ran a few special episodes through October, so this one catches us up on a whole month, and it's been a big one — then the US went to the polls to top it off. How are you feeling about the run sheet we've got planned for today, mate?
Javier Hernandez: I'll be honest, I've been kinda anxious to get back — there's a lot of news from the past month, with the election and everything, all in one episode. I've got about eleven tabs open in my head, another twenty on my computer, and I'm running on some coffee and some optimism here.
Shaun Hagen: We're in similar boats. Since the last episode recorded, I actually welcomed our first child, so I think we're both running on quite a lot of caffeine and optimism — hopefully we've got the right amount of both for our listeners' sake. Let me try and set the frame before we kick off. The big headline is that control of the US Congress is projected to change hands in January, and one of the first questions we've had from operators is: does that mean the tariffs go away?
Javier Hernandez: Short answer, it's not a clean yes. It's a bit of a grey area right now — honestly, it's still kind of a guess.
Shaun Hagen: Absolutely, and that's still playing out with the final counts and some of the final seats. But what's clearly not going away straight away is the tariffs that are actually being paid. And that's really the whole episode in one line: the results changed, but the cost base didn't, or hasn't yet. Tariffs, fuel, rent, peak — every one of them moved this month, and none of them moves back on a schedule you can control. So we'll stay factual and stick to what that means for your operation. Let's get into the news.
Javier Hernandez: First up, the election. Democrats will control both the House and the Senate when the new Congress sits on 3 January. As of this recording, a handful of races are still being counted, so the final numbers are still to be determined, but the outcome is certain. What matters for this show is what it means for trade and your costs — that's deep dive number one.
Shaun Hagen: Next up, warehouse space. In the US, CBRE has industrial vacancy at 6.4%, after the strongest quarter of demand since late 2022. Prologis, the biggest landlord in the sector, says spare capacity in its customers' networks has largely cleared. And in Australia, JLL says it's had the biggest quarter of warehouse leasing on record, with vacancy down to 4.6%. We'll get into that in deep dive number two.
Javier Hernandez: And every time we talk about automation, this one's a genuine shift. GXO, one of the biggest contract logistics providers, is taking Agility Robotics' Digit humanoid robots to two more US sites early next year. In the same window, Walmart committed about $6 billion over several years to put Symbotic automation into twenty-five of its regional distribution centres.
Shaun Hagen: Not a trend we're unfamiliar with, but the biggest players keep pressing their advantage. What's really interesting is that the rental model is what starts to bring automation within reach of smaller operators — that's what's being called robotics as a service, or hiring automation. We'll come back to that on the watch list.
Javier Hernandez: And while all that's going on, peak's already here. Australia Post expects more than 120 million parcels across November and December. Over here, UPS is hiring more than 100,000 seasonal workers — fewer than last year, but that's because it's carrying less of Amazon's volume and running a much more automated network. That's deep dive number three.
Shaun Hagen: Four main stories, one thread — every one of them is a cost or constraint that moved this month. The operators who come out ahead are the ones who plan for it rather than wait for it to reverse.
Javier Hernandez: And speaking of space, Shaun, I hear you've got a fun fact about bananas.
Shaun Hagen: I do, and I promise the bananas are in their place. Our logistics fun fact for this episode: in Western Sydney, Woolworths' new chilled and fresh distribution centre is more than 95% built. Its builder says it'll be the largest multi-storey temperature-controlled distribution centre in the Southern Hemisphere — more than 93,000 square metres, and it's planned to move over 6,000 tonnes of fruit, veg and chilled food a day. It opens next year, and it has dedicated rooms whose only job is to ripen bananas. Have you ever been in a building where the bananas get their own rooms?
Javier Hernandez: No, but don't tell my siblings — they had to share rooms growing up, so I'm a little jealous on their behalf. Honestly, it's like a hotel where the guests are fruit and checkout time really matters. What gets me is that they built it upward, with chilled and fresh stock across two floors.
Shaun Hagen: And there's a serious point under the banana room. Woolworths, one of the major grocery chains in Australia, looked at fresh food and decided to run distribution itself at enormous scale, rather than hand it to a 3PL. For a 3PL, that's the question to be ready for: your biggest customers can bring it in-house, and some will. The ones who stay are the ones you can show are faster, cheaper or more flexible than doing it themselves — no answers as to why we wouldn't just do this ourselves before our customer asked it, but maybe stop short of building your own dedicated banana room.
Javier Hernandez: And with space getting tighter, the answer matters more — which is a neat way into the deep dives.
Shaun Hagen: Deep dive number one. We sound like a broken record, but we've been tracking tariffs and fuel for a few episodes now, so this is the next chapter. Cost of living was the big issue going into this vote in the US, and tariffs were a big part of that — in one large pre-election poll, three in four voters said tariffs would matter to how they voted. The natural assumption is that tariffs and fuel costs ease from here with the result of the election. But as I said at the start, the tariffs you pay at the border haven't changed, and neither has the diesel bill — or at least not yet.
Javier Hernandez: It's worth being clear on why, because it's a question we keep getting from customers on this side of the border. The new Congress doesn't sit until 3 January. Most of the tariffs in place now rest on trade laws that let the president act without a new vote, and any bill to undo them can be vetoed — overriding a veto needs two-thirds of both chambers. So nothing about the election changes the customs collections this week.
Shaun Hagen: That's right, and that two-thirds majority doesn't look likely to change in the short term. So the honest planning assumption is that this is a 2027 question at the earliest. If your goods touch a US border, don't rebuild your sourcing plan around the results just yet.
Javier Hernandez: For the operator moving goods across the border right now, the real homework isn't politics — it's "what do I do on Monday?"
Shaun Hagen: Same advice we gave in September, when Canada's retaliation went live — it still holds. First, assume current tariffs carry into your next planning cycle, and confirm your contracts actually say who pays for them. Second, don't lock in a multi-year sourcing decision on the assumption that tariffs come off quickly. Plan for them to stay, and treat any relief as upside.
Javier Hernandez: And then there's fuel — the other thing voters were feeling this week. And it actually moved.
Shaun Hagen: It did, and quite a lot. Brent, the global oil benchmark, had its biggest weekly drop since 2020, down more than 13% to just under $100 a barrel, as markets bet on things easing with Iran after the election. But here's the number that matters for a fleet: US diesel was about $6.29 a gallon in the latest weekly figures — down six cents on the week, but still roughly $2.50 higher than a year ago. Pump prices lag crude, we know that, and one week isn't necessarily a trend. OPEC held its output flat at the start of November, and the tanker attacks near the Strait of Hormuz on Friday were a reminder this can turn just as fast the other way.
Javier Hernandez: Which is why the other question I'd ask is how your fuel surcharges actually work. Is it indexed to diesel? Who updates it, and how often? Or is it a flat rate someone reviews once a year — in which case you either eat the spikes or sit on the falls, and customers notice both. A surcharge that moves both ways is a lot easier to defend.
Shaun Hagen: That's right. The playbook is simple: price your contracts for the environment you're actually in, not the one the headlines suggest is coming.
Javier Hernandez: Deep dive two — warehouse space is running out. In the US, CBRE puts industrial vacancy at 6.4%, and demand last quarter was the strongest since late 2022. Prologis, the biggest landlord in the sector, is 95.6% occupied, and when leases come up, the new rents are resetting about 38% higher than the old ones. Their chief executive says customers are running lean on inventory and the excess capacity in their networks has largely cleared.
Shaun Hagen: And as we keep saying, not that it's a competition, but in Australia it's even tighter. JLL says we've just had the biggest quarter of warehouse leasing on record, with vacancy down to 4.6% and new completions dropping to their lowest since 2021. The one thing that hasn't moved yet in Australia is rent — JLL said rents have basically been flat for the quarter. So in Australia, this is a warning, but not an invoice yet. Record demand with half the new supply is exactly how a rent reset can start.
Javier Hernandez: Pretty basic business, right — supply and demand. If your warehouse lease renews in 2027, start the conversation now, because the spare space that kept rent rises modest for the last couple of years is mostly gone.
Shaun Hagen: Sounds a lot like renting in a tight housing market — supply and demand, basic economics: rent goes up, and the landlord knows you've got nowhere else to go. Where does it actually bite for a mid-sized 3PL?
Javier Hernandez: Three places, really. First, map every lease and customer contract that renews in 2027, and start the conversation 18 months out, not six. Second, check that your storage rates and escalators actually track your cost of space — a lot of contracts don't. And third, ask yourself where that storage rate actually lives — is it in a spreadsheet someone updates by hand, or is a rent increase going to turn into a repricing project right before your busiest season?
Shaun Hagen: And a third part is knowing your real capacity. In our CartonCloud Logistics Index episode, operators told us they're using about 77% of their capacity on average, and the smaller operators with the most room to spare were the least confident about the next six months. I think that's a link, not proof.
Javier Hernandez: Like we said — space you can't fill isn't an opportunity, it's a cost. And that cost just went up.
Shaun Hagen: So here's a question for you, Javier — it's the one that logically follows. If my lease renews in 2027, do I reprice my customers now, or wait until the new rent is signed?
Javier Hernandez: My view is: start the conversation now. Don't charge the new price yet, but tell customers early that space costs are going up and a review is coming at renewal. Then when the numbers are actually signed and hit, the price change is a follow-up conversation, not a huge surprise.
Shaun Hagen: And what if customers hear "review coming" and go shopping? Is it safer to wait until you know the number, or how do you avoid scaring customers off?
Javier Hernandez: It's a bit like a restaurant telling you at the door that prices have gone up, rather than you finding out when the bill arrives — the price is the same either way, but it gives you the chance to decide whether to stay. Customers are pretty much the same: the ones who find out from an invoice tend to leave quietly, there's that shock factor. The ones who hear from you early, with a date and a reason, usually stay, because there's been communication. If you wait until the new rent is signed, you've probably already absorbed a few months of the higher cost, and you're not going to get that back.
Shaun Hagen: And as we've said, the earlier conversation is a lot easier, especially if you've got escalators pre-baked into the contract, where customers allow that. If they don't, that's one thing you can look to fix at the next renewal.
Javier Hernandez: Agreed. Reprice on a schedule you choose, not the landlord's.
Shaun Hagen: Deep dive three. In Australia, the headline is more parcels and very little room for error. Australia Post expects more than 120 million parcels across November and December, up from around 111 million last year, which was already a record. Its standard parcel cut-off is 21 December for most of the country, and as early as 14 December for parts of Western Australia and the Northern Territory. Your customers' orders go out through that network, so a missed cut-off or delayed parcel becomes your late delivery.
Javier Hernandez: And over here in the States, not that it's a competition — USPS recommends shipping Ground Advantage by 17 December. FedEx Ground Economy's last day is 15 December, and UPS Ground depends on your route. The UPS hiring number is worth reading properly too: it's hiring more than 100,000 seasonal workers, fewer than last year for the second year running — not because it's short on people, but because it's deliberately cut its Amazon volume, and it says nearly 70% of its packages now run through an automated process. It's sizing the network much more tightly to what customers are actually forecasting.
Shaun Hagen: That's the bit that matters for a 3PL — if UPS expects volumes to jump about 25% from Q3 to Q4, and it's planning that off its customers' forecasts, if your peak is going to run well above that, you need to tell your carrier now, not as soon as Black Friday drops or the Christmas peak starts. Beyond communicating volume to carriers, what else can operators actually do to prepare?
Javier Hernandez: Communication is the theme, but three things. First, know the cut-off dates and work back from them — take the carrier date, set your own two to three days earlier to avoid surprises, put it in your system, and communicate it to customers, not just the spreadsheet. Second, make sure nothing holds a parcel back, and that starts with labels — it's the one thing people forget, and it causes some of the biggest hold-ups. You assume the labels are right, the printers are good, pickups are good, right until the first batch gets stuck.
Shaun Hagen: Australia Post has been saying exactly that to customers — its parcel team has called out warehouse labelling as one of the critical factors in how fast parcels move through the network. A bad label can send a parcel round the sorter again and again, and a parcel stuck in the sorter is a parcel that misses the cut-off.
Javier Hernandez: So test-scan a sample now, before you get busy. Standardise your carton sizes, and treat label validation as a simple safety net for the dates you've just set.
Shaun Hagen: You said there were three things — what was the last one?
Javier Hernandez: People. Black Friday is 27 November, Cyber Monday is 30 November, and volume keeps climbing through December. If your temporary staff aren't locked in yet, do it this week, so they're trained before the spike, not during it.
Shaun Hagen: As I mentioned at the start — once dates, labels and people are sorted, tell your customers the date early so they can plan around it too. That's what keeps everyone calm in December. In Australia, we have a slightly different trend: the Black Friday, Cyber Monday and Christmas peak actually overlaps with the Christmas shutdown period and summer leave. So on top of planning for the peak, we also have to factor in who's actually rostered, not just who's hired — and we've got a bonus little sale called Boxing Day, the day after Christmas, so all of this gets exacerbated right over the summer holidays when we're meant to be relaxing. Peak doesn't create problems, it just exacerbates the ones you already have. Good luck to everyone out there for the next couple of weeks.
Shaun Hagen: The operator playbook. Number one: price for the environment you're in. Even with Congress changing hands in January, the tariffs you pay haven't changed yet — confirm who pays the tariffs on each contract, make sure your fuel surcharge moves both ways, and don't bet your sourcing on tariffs coming off quickly.
Javier Hernandez: Number two: get ahead of the rent reset. Put every 2027 lease on one calendar, and start the landlord conversation 18 months out. Check your storage escalators actually track your cost of space, and reprice your customers on a schedule you choose, not the landlord's.
Shaun Hagen: And number three: work back from the cut-offs. Set your own peak cut-offs a few days earlier than the carriers, validate your labels now, give your carriers an honest peak forecast, and get your temporary staff locked in before Black Friday.
Javier Hernandez: For the watch list — first, trade. Watch whether the new Congress and the ongoing talks with Canada and Mexico actually change any of the tariffs paid, because so far, nothing has.
Shaun Hagen: Second, fuel. OPEC meets again on 29 November — that, and whether this week's fall in crude actually reaches the pump, sets the tone for diesel into the new year.
Javier Hernandez: And third, watch whether more robot makers start offering robotics as a service — once automation is a monthly bill instead of a capital purchase, it becomes a real option for smaller 3PLs too.
Shaun Hagen: And I will die on the hill that that's how robotics enters the mid-market.
Shaun Hagen: I'm Shaun Hagen.
Javier Hernandez: I'm Javier Hernandez.
Shaun Hagen: And this has been This Week in Logistics. Whatever's moving this quarter, check it, price it, and tell your customers before they have to ask. We'll see you next time.
Explore the resource hub
Tips, tools, downloadable guides and stories from logistics teams who are working smarter.

.webp)
.webp)

.webp)





.webp)









